The planning appeal was successfull and full planning for the 11 units was granted. We are expecting to start on site June/July 2011.
Providing affordable housing for local people without public subsidy is a tall order. It requires understanding and assistance from all concerned. The objective at Connor Downs is to provide 11 affordable houses consisting of three different house types, different sizes and styles ensuring that a wide spectrum of local needs are catered for.
As we are not a housing association - but still have to comply with government legislation on Affordable Housing - we have had to be innovative in our legal sales structure. So we offer 999 year leases with a small ground rent - but sell our houses at cost. They are normally likely to show purchasers a saving in their monthly outgoings, even taking into account the ground rent of £20pw over the rent on a private property in the area. Major lenders accept this system, and the only obligation which is different from a freehold sale is that the property cannot be sold in the future for a higher percentage of open market price than applied on our first sale of the house. That figure is accessed by two independant chartered surveyors.
The site is located on the outskirts of Connor Downs accessed through an existing development of Arundel Court. The village of Connor Downs provides a local pub, fish and chip shop, convenience store, petrol station, doctor's surgery, post office and local primary school.
Connor Downs lies between Hayle and Camborne which offer a good range of facilities, including mainline railway stations, a bus station in Camborne, primary and secondary schooling and a comprehensive range of shops one would expect to find.
Wherever possible the wishes and preferences of the local people will be taken into consideration during the development.
The affordable homes will be completed on a phased basis with a 15 month build programme. First occupants are expected 22 weeks into the contract with all houses being occupied by the end of the contract period. Target dates may vary due to adverse weather conditions or other factors. We and the developers have every incentive to finish the development as quickly as possible.
Wherever possible the wishes and preferences of the local people will be taken into consideration during the development.
As no public subsidy is available the occupiers need to be local people who are in employment. But the objective is to help those who are unable to afford the very high price of open market housing in Cornwall.
We have advertised, held a public meeting and had discussions with Cornwall Council Housing Officer. We will identify people who have a necessary strong connection with the Gwinear/Gwithian parish and comply with government guidance criteria for allocation of affordable housing.
0300 1234 100
Front and rear garden area turfed
Pathways laid in natural grey paving slabs
Close boarded fencing to the rear
All window frames are white Upvc
Rainwater pipes and gutters in low maintenance Upvc
Outside lights to front of property
Variety of front door style with glazing
Doorbell to front door
Stylish six panel doors finished in eggshell
Satanised aluminium finish door handles
Curtain battens to all rooms except, kitchen, bathroom and cloakroom
Smooth finish ceilings
Walls finished in emulsion
Telephone connection points are provided to lounge, bedroom one and two
Ample well placed power points
Coving throughout
Smoke detectors
Skirting and architraves finished in white eggshell paint
TV point in lounge
Range of base and wall units
Rolled edge co-ordinating worktops
Stainless steel inset bowl with single drainer
Built in oven and hob
Extractor hood/chimney
Space for washing machine
Space for upright fridge/freezer
Flourescent light fittings
Wall tiling
Vinyl flooring
Modern style sanitary ware in white
Chronium plated taps
Pendant light fittings
Matching wash hand basin and close coupled low level WC
Tiled splashback to basin, around bath and on window sills
Shaver power point
Electric shower over bath
Shower rail
Modern white sanitary ware with matching chrome plate taps
Pendant light fittings
Tiled splash back to basin
Please note choice of finishes and fitments detailed in this specification are only available where stage of construction permits.
October 2008
March 2009 - Declined
August 2009
FULL PLANNING APROVED
June/July 2011
Mid - Late 2012